Correct service charge procedures
Residential leases usually contain detailed procedures that must be followed before valid demands for service charges can be raised. Some landlords sidestep such requirements for reasons of convenience, but an Upper Tribunal (UT) decision has underlined the hazards inherent in such a course.
The case of Jetha & Anr v Basildon Court Residents Company Limited (2017) concerned a prestigious block of 56 flats, the common parts of which were owned by a services company.
The tenants of 11 of those flats had refused to pay service charges due to various concerns about the property’s management. The company launched proceedings to recover arrears of more than £40,000.
The First-tier Tribunal (FTT) found that the lease did not provide for the collection of interim service charges on account. Those charges and contributions to a sinking fund maintained by the company had not been agreed at an annual general meeting (AGM), as required by the lease.
The FTT, however, found that the disputed bills were payable on the basis that the procedure employed by the company was well established and the tenants had never objected to it in the past.
In upholding the tenants’ challenge to the latter ruling, the UT noted that the requirement that service charges be approved by a majority at an AGM was an important safeguard. It was neither unfair nor unjust for the tenants to rely upon the letter of the lease and, in the circumstances, the disputed bills were not payable.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.





















